Combination of Absorber and Chimney Limestone/ lime-gypsum Wet Process FGD

Process Introduction

The flue gas from electrostatic precipitator is discharged into absorber and reacts with limestone slurry through booster fan, and produces gypsum. The treated flue gas after desulfurization is emitted into the atmosphere by the straight chimney set at the top of absorber. Through two times dehydration, the moisture content of gypsum is not more than 10%.

Technical Features

 Smaller footprint, especially suitable for retrofit project with limited space; 

 No need to reconstruct the old stack; 

 Lower capital cost (without GGH and treated gas duct) and operation energy consumption; 

 Shorter construction duration (about 4 months can be shortened). 

Jiangyin Thermal Power Co., Ltd  Retrofit Project
















SOCIAL

Copyright (C) 2010 Beijing Longyuan Environmental Protection Engineering Co. Ltd. Beijing ICP No. 09076368 Beijing Public Security No. 110108007976 
深圳保鏢公司污水處理玻璃鋼水箱電纜廠家
郎溪县| 彩票| 友谊县| 东安县| 岑巩县| 广河县| 福泉市| 益阳市| 常熟市| 彩票| 八宿县| 名山县| 霍州市| 日土县| 邹平县| 开江县| 日喀则市| 阆中市| 双流县| 方城县| 鄂托克前旗| 淮阳县| 长乐市| 麻阳| 龙州县| 哈尔滨市| 舟山市| 沾益县| 峨边| 清河县| 福建省| 瓦房店市| 陆川县| 华容县| 五峰| 驻马店市| 讷河市| 杭锦旗| 兰溪市| 平和县| 高密市|