Combination of Absorber and Chimney Limestone/ lime-gypsum Wet Process FGD

Process Introduction

The flue gas from electrostatic precipitator is discharged into absorber and reacts with limestone slurry through booster fan, and produces gypsum. The treated flue gas after desulfurization is emitted into the atmosphere by the straight chimney set at the top of absorber. Through two times dehydration, the moisture content of gypsum is not more than 10%.

Technical Features

 Smaller footprint, especially suitable for retrofit project with limited space; 

 No need to reconstruct the old stack; 

 Lower capital cost (without GGH and treated gas duct) and operation energy consumption; 

 Shorter construction duration (about 4 months can be shortened). 

Jiangyin Thermal Power Co., Ltd  Retrofit Project
















SOCIAL

Copyright (C) 2010 Beijing Longyuan Environmental Protection Engineering Co. Ltd. Beijing ICP No. 09076368 Beijing Public Security No. 110108007976 
深圳保鏢公司污水處理玻璃鋼水箱電纜廠家
静安区| 临颍县| 肥乡县| 定安县| 拉萨市| 永济市| 汝南县| 城市| 南开区| 利川市| 普陀区| 阿拉尔市| 肇东市| 民和| 博白县| 禄丰县| 惠东县| 绥德县| 元江| 防城港市| 新乡市| 赫章县| 梓潼县| 玉树县| 香格里拉县| 无极县| 桐庐县| 公主岭市| 岱山县| 壤塘县| 湖南省| 富源县| 改则县| 吉首市| 水城县| 温州市| 黑龙江省| 渑池县| 兰西县| 通州区| 长汀县|